Project Info:
First oil from the Abo field was produced through the Abo FPSO in April 2003. With it, nae set the record of being the first company to produce oil from the nation’s deep offshore. Abo Extension development was carried out between 2006 and 2009 with the drilling and tie-in of Abo 10 and 11 production wells plus Abo 9 gas injector. Peak production of 37,300 bopd (100%) was achieved from the field in February 2010.
Nivafer's scope for this project include fabrication, inspection, blasting and painting of a subsea plem for Abo III field
Procurement
Fabrication